Understanding productivity scores
The productivity score sums up a day in one number, so you can spot the ones worth a closer look.
How it's built
Productive time is time in productive and uncategorised apps and sites, plus approved focus blocks: the same figure as Productivity vs Limit. The score is that time as a share of the member's daily limit, up to 100%. It is always measured against the limit, not against the hours tracked, so a short day scores lower.
- 2h 23m productive against a 6h limit scores 40% (Needs Attention), even if only 2h 28m was tracked.
- 6h or more productive against a 6h limit scores 100% (Excellent). Time past the limit doesn't add more.
- Over several days, each day counts up to its own limit, and the total is divided by those days' limits added up: five 6h days are scored out of 30h.
- Days with nothing tracked and days on approved leave aren't counted.
The card shows what the score was measured against, for example “of 6h limit”. A member with no daily limit is scored against the time tracked instead.
Ratings
- Excellent: 90 to 100.
- Good: 70 to 89.
- Fair: 50 to 69.
- Needs Attention: below 50.
Where it's used
- On each row in the pending queue.
- As the threshold for auto-approval. A timesheet shorter than the daily limit scores lower, so it is less likely to pass the threshold.
- In team reports, to compare across a period.
App productivity is set by your Productivity Policy — review it if scores look off for your team's tools.
Was this article helpful?
Need more help? Email support@xTracker.work or use our contact form.